JEA power line increases dramatically for JaxPort vessels
The cost of building high-voltage power lines across the St. Johns River to allow larger cargo ships to pass through has now risen to around $105 million, double the estimated…
The cost of building high-voltage power lines across the St. Johns River to allow larger cargo ships to pass through has now risen to around $105 million, double the estimated…
The Gay Street Bridge is in “critical condition”; several steel parts are deformed and shifted, which could lead to “local failures,” according to an inspection report by the Tennessee Department…